SportsCatch
EN

OM's €70M Training Ground Project in Trets Sparks Fierce Local Debate

Olympique de Marseille is considering leaving La Commanderie for a new €70 million training ground in Trets, in the Aix region. The project, which would consolidate several club teams across a dozen hectares, is already dividing the municipality between municipal support and fierce opposition from agricultural land defenders.

2 min read
OM's €70M Training Ground Project in Trets Sparks Fierce Local Debate
Share

Olympique de Marseille is considering leaving La Commanderie for a new training ground in Trets, in the Aix region, with an estimated cost of €70 million. The project, first mentioned on 21 October by president Stéphane Richard, is already generating significant local tensions before being officially approved.

The current facility, the Robert-Louis-Dreyfus centre inaugurated in 1991 in the heights of Marseille’s 12th arrondissement, has only three pitches across nine hectares. The challenging terrain and the persistent refusal of the Serviane sisters to expand the site led the club to explore other options, after ruling out Borély and Ventabren. Trets, where the Pro2 already played last season, is now the preferred option.

According to preliminary plans, the project would take between three and a half to four years to complete. The club is targeting a plot of around a dozen hectares on the edge of the RD56 road, near the Roubaud estate, with less expensive land than in Marseille and flat terrain suitable for development. A resolution from the Aix-Marseille-Provence Metropolitan Authority from 6 October 2025 mentions two playing fields with six pitches each, a performance and training centre, a gymnasium, administrative and medical facilities, accommodation and technical areas. The first team, Pro2, U19 and U17 could be consolidated there, while La Commanderie would be reserved for the women’s team and younger age groups would remain at OM Campus.

The site would be approximately 45 minutes’ drive from the Vélodrome, a distance fuelling criticism. Opposition councillors Julien Doumas and Myriam Lorcet denounce a lack of transparency and point to the loss of agricultural land acquired in 2010 to establish a nature reserve. They also question the waterproofing of an already urbanised sector exposed to flooding, the municipal finances tied to infrastructure maintenance, the energy consumption of the future facility and the site’s closure to the public.

Facing these criticisms, mayor Pascal Chauvin, re-elected in March 2026, defends the project. He highlights OM’s prestige, territorial dynamism and positive economic impact for the municipality, while downplaying agricultural loss against more than 80 hectares of unexploited plains in Trets. The debate between sporting ambition and land preservation looks set to be long before any groundbreaking.

Share
{# Sitewide native fullscreen interstitial — our own bet-CTA card blown up to a takeover (replaces the SDK overlay). The shared card animations + countdown load once, AFTER the interstitial markup, so the countdown script's first tick sees this card's node too (the in-read card, in
above, already exists). One include covers both surfaces. #}